Commissioning The Management System - Huawei FusionModule1000A20 Commissioning Manual

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A20:
Table of Contents

Advertisement

FusionModule1000A20 Prefabricated All-in-One
Data Center
Commissioning Guide
As the management system parameters are complex, you are not allowed to
modify the initial configurations unless you are authorized by an appropriate
person.
Initial configurations have been made for the FusionModule1000 management
system before delivery. To modify the initial configurations of the management
system, make the following preparations:
1.
2.
3.

7.3.2 Commissioning the Management System

Prerequisites
The FusionModule1000 is powered on, commissioned, and working properly.
During the commissioning, if any alarm is raised, clear the alarm before
continuing the commissioning.
Preparations
Tool: network cable tester
Documents: monitoring device layout diagram, management system initial
configuration table
Skill requirement: weak-current engineer familiar with the management system
Procedure
Step 1 Commission the ECC800.
1.
2.
Issue 03 (2022-12-15)
NO TICE
Read through all related management system documents and get familiar
with the detailed management system configurations, configuration method,
and operating principles.
Get familiar with the initial configuration parameters of the management
system by referring to the management system initial configuration table in
the initial configuration parameter manual.
Modify the parameters for the management system based on the initial
configuration table, and save a copy for future reference.
NO TICE
Enter the initial user name and password on the ECC800 WebUI to log in to
the ECC800 WebUI.
Check the connections of all monitoring devices by referring to the monitoring
device layout diagram.