Huawei FusionModule1000A20 Commissioning Manual page 68

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A20:
Table of Contents

Advertisement

FusionModule1000A20 Prefabricated All-in-One
Data Center
Commissioning Guide
Documents: documents delivered with the TP48400B, power supply and
distribution device layout diagram, power supply and distribution device initial
configuration table,
TP48400B-N20B3 & TP48400B-L20B1 Indoor Power System Installation Guide
Skill requirement: power distribution engineer
Procedure
Step 1 Measure the input voltage on the AC input circuit breaker. The value should range
from 85 V AC to 300 V AC.
Step 2 Switch on the AC input circuit breaker and measure the output voltage on the AC
input circuit breaker. The value should range from 85 V AC to 300 V AC.
Step 3 Check that the Run indicators on PSUs are steady on.
Step 4 Measure the voltage between the −48 V busbar and RTN+ busbar. Ensure that the
voltage is in the range of −42 V DC to −58 V DC.
Step 5 Power on the TP48400B, and view and complete its initial configuration.
● During the TP48400B commissioning process, modify the initial configuration
parameters by referring to the power supply and distribution device initial
configuration table.
● If any alarm is raised, rectify the fault before continuing the commissioning.
Step 6 Set parameters such as Battery connected, Rated capacity, BLVD Enable,
Installation Time, and Volt. Detect Mode based on the actual configurations.
Issue 03 (2022-12-15)
TP48200B-N20B2 & TP48200B-N20B3 & TP48200B-L20B2 &
NO TE
For the diagrams and tables, see the initial configuration parameter manual for the solution
in use.
NO TICE
NO TE
Set the voltage test mode if the cable for monitoring single battery voltage is configured.
Copyright © Huawei Digital Power Technologies Co., Ltd.