Equipment Check; Site Check - Tyco Software House iSTAR eX Installation Manual

Table of Contents

Advertisement

Site Requirements - Pre-Installation Planning

Equipment Check

Site Check

Pre-installation involves the following:
1. Checking equipment (hardware, software, power supply, and wiring).
2. Checking power, wiring, equipment clearances, and code compliance at the site.
3. Ensuring the proper tools are available.
Verify that the contents of the shipped boxes match the packing lists. Contact Software House
if any items are missing or damaged.
The iSTAR eX hardware does not include mounting hardware for an installation. Mounting
hardware depends upon the site and must be approved by a structural engineer or other
certified professional.
Software House recommends anchoring systems capable of sustaining a 75 lb. (34.1 kg) load.
Ensure that the mounting site is ready:
Mounting dimensions
• Upper mounting holes are 14.25" (36.195 cm) center to center.
• Bottom mounting holes are 21.35" (54.229 cm) below the upper mount holes.
The site has been approved and all wiring complies with UL requirements and other
codes, as appropriate.
All preliminary site work is complete.
An appropriate power supply is accessible.
T
he site is clean and free of dust or other contaminants.