Checkout Procedure
Checkout Procedure
When the 4100 NIC installation is completed, verify its operation using the Network
Programmer's Reports. In addition, do the following:
•
•
•
•
Use Version 7.03 (or later) of the 4100 Programming Unit to make any corrections to the network
CFIG chips. (Refer to Publication NET-41-003 for programming information.)
Test point status changes
Test common annunciation
Interrogate the network about point information
Test common trouble point status reports and responses
firealarmresources.com
25