EFORE YOU
Gather Materials and Tools
Ensure ESD Protection
S
This document describes installing and removing the robotics shipping
bracket in a Spectra Stack library. The bracket is only required when a
Stack library is installed in a data center rack prior to shipping.
Estimated Time = 5 - 10 minutes
B
EGIN
Before installing or removing the shipping bracket, make sure that you
have addressed the following requirements.
Required
A #1 Phillips screwdriver
A small screwdriver
Recommended
An anti‐static mat
A static protection wristband or grounding footstrap
The installation environment must be free of conditions that could cause
electrostatic discharge (ESD). To protect the unit from ESD, follow these
procedures when repairing or testing the product:
Place a static protection mat on the work surface used while removing
and installing components. Use a 1‐megohm resistor to ground the
static protection mat.