Lauda IN 550 XT FC Operation Manual page 19

Integral process thermostats with flow control unit
Hide thumbs Also See for IN 550 XT FC:
Table of Contents

Advertisement

Fig. 3: Ring bolt (example)
V4
Fig. 2: Unpacking instructions
7.
Fig. 2: Remove the ring bolts from the packaging.
8.
Fig. 4: Screw the two ring bolts all the way into the thread connection
Ç (M10 or M16) on the top of the casing. Turn them clockwise to do
so.
Integral process thermostats with flow control unit
19 / 171

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents