Lauda IN 550 XT FC Operation Manual page 32

Integral process thermostats with flow control unit
Hide thumbs Also See for IN 550 XT FC:
Table of Contents

Advertisement

Mounting instructions for connecting an
application
32 / 171
Fig. 12: Connection diagram with vent valve
The external application must be connected according to the sketch (Fig. 12)
so that gas/vapor bubbles can be removed from the system and undisturbed
operation is possible. The outflow of the pump must be connected to the
lower connection of the application. The return line to the pump connector
must be connected to the top connection of the application. The application
is thus flowed through from bottom to top.
Hose nozzle:
Push the hose onto the hose nozzle. Secure the hoses against slipping
n
using hose clips or similar.
Ball bush and hose nozzle:
The sealing surfaces of the cone and ball bush/hose nozzle may not be
n
damaged (falling onto hard ground or similar).
Carefully remove dirt from the sealing surfaces (cone and ball bush /
n
hose nozzle) before assembly.
Place the ball bush/hose nozzle vertically on the cone (support the hose
n
when tightening).
The ball bush / hose nozzle may not rotate when tightening the union
n
nut (if necessary apply some grease or oil between the ball bush / hose
nozzle and union nut).
Tighten the union nut only moderately with the open-end wrench and
n
hold it against the connecting sleeve with a second open-end wrench.
Integral process thermostats with flow control unit
V4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents