Table 8: Site Preparation Checklist for SSR1400 Installation
Item or Task
Plan the rack location,
including required space
clearances.
Secure the rack to the floor
and building structure.
Cables
Acquire cables and
connectors.
Review the maximum
distance allowed for each
cable. Choose the length
of cable based on the
distance between the
hardware components
being connected.
Plan the cable routing and
management.

SSR1400 Site Guidelines and Requirements

IN THIS SECTION
General Site Installation Guidelines | 17
Site Electrical Wiring Guidelines | 17
Environmental Requirements and Specifications for SSR1400 | 19
Clearance Requirements for Hardware Maintenance of SSR1400 | 19
Additional Information
"Clearance Requirements for Hardware Maintenance of SSR1400" on page 19
(Continued)
16

Advertisement

Table of Contents
loading

Table of Contents