Jrr200 Site Guidelines And Requirements - Juniper JRR200 Hardware Manual

Route reflector
Hide thumbs Also See for JRR200:
Table of Contents

Advertisement

Table 12: Site Preparation Checklist for JRR200 Route Reflector
Item or Task
Secure the rack or cabinet to the floor and building
structure.
Cables
Acquire cables and connectors:
Determine the number of cables needed based
on your planned configuration.
Review the maximum distance allowed for each
cable. Choose the length of cable based on the
distance between the hardware components
being connected.
Plan the cable routing and management.

JRR200 Site Guidelines and Requirements

IN THIS SECTION
JRR200 Route Reflector Environmental Specifications | 21
General Site Guidelines | 21
Site Electrical Wiring Guidelines | 22
Clearance Requirements for JRR200 Route Reflector Airflow and Hardware Maintenance | 23
(Continued)
Additional Information
Performed By
20
Date
Notes