Table 7: Site Preparation Checklist (continued)
Item or Task
Verify that there is appropriate clearance in
your selected location.
Cables
Acquire cables and connectors:
Determine the number of cables needed
based on your planned configuration.
Review the maximum distance allowed
for each cable. Choose the length of cable
based on the distance between the
hardware components being connected.
Plan the cable routing and management.
SSR120 Site Guidelines and Requirements
IN THIS SECTION
For More Information
Performed by
Date
20