Electrical Connection; Hydraulic Connection - ATH-Heinl RG 5.5 WG User Manual

Mobile column lift
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 66
2.5
Location
Drawing
2.6

Electrical connection

The general and local regulations must be observed.
Therefore, this step may only be carried out by a trained specialist. Pay attention to the
necessary supply line (see technical data).
The charging of the batteries should be done according to the product with a 230V Schuko plug.
Voltage deviations should not exceed 0.9 - 1.1 times the nominal voltage range and frequency deviations
should not exceed 0.99 - 1.01 times the frequency range. To be able to guarantee this, necessary protective
measures must be taken.
At the end of the work, the direction of rotation of the motor must be checked.
2.7

Hydraulic connection

Before the unit is put into operation or operated with oil for the first time, the following
must be observed with regard to the optimal, trouble-free as well as almost air-free
function.
® Copyright ATH-Heinl GmbH & CO.KG, All rights reserved / Misprints and technical changes reserved