ABB ACH580-31 Hardware Manual page 50

Industrial drives
Hide thumbs Also See for ACH580-31:
Table of Contents

Advertisement

50 Mechanical installation
R6 IP55 (UL Type 12)
3
9
12
5
7
A
A
1
Printed quick installation and start-up
guide and manuals, multilingual resid-
ual voltage warning sticker
2
Accessories
3
Bubble wrap
4
Mounting template
5
Package straps
6
Plastic bag
To unpack:
• Cut the straps (5).
• Remove the outer box (8).
• Open the VCI bag (11).
• Undo the attaching screws (A, B).
• Lift the drive.
8
11
4
6
2
1
10
B
B
7
Drive with factory installed options
8
Outer box
9
Cardboard insert
10
Pallet
11
VCI bag
12
UL Type 12 hood
3AXD50000038252

Advertisement

Table of Contents
loading

Table of Contents