Connect the phase conductors of the motor cable to the T1/U, T2/V and
T3/W terminals and the phase conductors of the input cable to the L1, L2
and L3 terminals.
•
If DC cables are present, use only two phase conductors and the ground
conductor. Connect the phase conductors to the UDC+ and UDC- terminals.
EMT
•
Tighten the screws to the torque given in the installation drawing below.
7
L1, L2, L3, T1/U, T2/V, T3/W, UDC+, UDC-, PE (Ground): 1.7 N·m (1.2 lbf·ft)