ABB ACH580-31 Hardware Manual page 125

Industrial drives
Hide thumbs Also See for ACH580-31:
Table of Contents

Advertisement

Connect the phase conductors of the motor cable to the T1/U, T2/V and
T3/W terminals and the phase conductors of the input cable to the L1, L2
and L3 terminals.
If DC cables are present, use only two phase conductors and the ground
conductor. Connect the phase conductors to the UDC+ and UDC- terminals.
EMT
Tighten the screws to the torque given in the installation drawing below.
7
L1, L2, L3, T1/U, T2/V, T3/W, UDC+, UDC-, PE (Ground): 1.7 N·m (1.2 lbf·ft)
Electrical installation – North America (NEC) 125
R3
8
7
8
7

Advertisement

Table of Contents
loading

Table of Contents