Commissioning The Cp - Siemens SIMATIC NET ET 200SP Operating Instructions Manual

Industrial ethernet
Hide thumbs Also See for SIMATIC NET ET 200SP:
Table of Contents

Advertisement

Power supply at connector X80
You will find the location of the connector X80 four the power supply to the CP in section
Power supply (Page 36). There, you will also find notes on reverse polarity protection.
The 2-terminal plug-in terminal block has the following pin assignment for the socket:
Terminal
1L+ / 2L+
1M / 2M
The two terminals 1L+/L2+ and 1M/2m of the terminal block are each bridged internally so
that you can connect either a single or a redundant power supply.
Connectable cable cross-section
● Without wire end ferrule 0.2 .. 2.5 mm
● With wire end ferrule 0.25 .. 1.5 mm
● With TWIN wire end ferrule: 0.5 .. 1.0 mm
You will find information about the power consumption and further technical details of the
connectors in section Technical specifications (Page 99).
3.4

Commissioning the CP

Requirement: Configuration prior to commissioning
A prerequisite for full commissioning of the module is the completeness of the STEP 7
project data.
Commissioning the module
Further commissioning involves the following steps:
1. Compiling the project data
2. Downloading the STEP 7 project data to the device
The STEP 7 project data of the CP is transferred when you load to the station.
To load the station, connect the engineering station on which the project data is located
to the CPU.
You will find more details in the STEP 7 information system in the section "Compiling and
downloading project data".
CP 154xSP-1
Operating Instructions, 12/2019, C79000-G8976-C426-05
Assignment
24 VDC
Ground
/ AWG 24 .. 13
2
/ AWG 24 .. 16
2
Installation, wiring, commissioning
3.4 Commissioning the CP
/ AWG 20 .. 17
2
47

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cp 1542sp-1Cp 1542sp-1 ircCp 1543sp-1

Table of Contents