20 Apr 19% 01:34:45
1.000 000 000-20.126 CB
1.500 000 WO-20.155 d)
2.000 OW 000-20.197 CB
3.000 000 M)O-20.19 dB
9.000 000 000-20.235 dl
10.500 000 000-20.257 a
12.000 000 wo-20.295 dB
13.500 OW 000-20.307 dB
15.000 000 000-20.317 d)
16.500 000 000-20.412 dB
19.500 OW 000-20.345 dB
1. Frequency of the data points
2. Results of magnitude measurement as measured in the performance
verification.
3. Upper hit line as defined by the total system uncertainty specMcation.
Lower limit line as delIned by the total system uncertainty specWation.
4.
6. Difference between the measured results and the knit line A positive
number indicates a pass An asterisk (*) indicates a fail.
Margin
Upper lim
-20.197 a
-20.208 ce
-20.234 8
-20.246
-20.574 &
-20.65
-20.666 dl
-20.675 dB
System Verification and
233