Communication Port - ADS-tec StoraXe PowerBooster GSS0608 Manual

Compact storage system
Table of Contents

Advertisement

7.4.4 Communication port

The cable entries on the underside of the housing are used to feed in the communication line for local
diagnosis and monitoring of the battery storage system, the optional supply line for connecting charging
stations, smart meters or service, and the optional supply line for an external emergency stop signal.
1
F
17: C
IGURE
OMMUNICATION LINE IMPLEMENTATION
3
3 4
2
F
18: P
IGURE
LUGGING IN THE COMMUNICATION LINE
Page 44 of 72
Opti onally carry out
GSS0608
Follow the electrical diagram for all
electrical connections.
Cable gland for communication
lines and smart meter
1
Feed in the LAN connection
line to the customer network
(Customer LAN) from the
outside through the cable
gland.
Optional: Feed in the LAN
connection line of the smart
meter (provided by the
customer) from the outside
through the cable gland.
Optional: Feed in the 2x1.5mm
cable lines for an external
emergency stop signal through
the cable gland.
Make sure that the cable inlets
are sealed from the outside.
-FC10: Connection option for an
2
external emergency stop signal
Connect 2x1.5mm
-F03: Communication line for
3
customer network (Customer LAN)
Connect the LAN
communication line to the
RayDat overvoltage protection
device (-F03).
-F04: Optional supply line for
4
connecting charging stations, smart
meters. Service connection.
Connect the LAN connection
for smart meter or service, for
example, to the RayDat
overvoltage protection device
(-F04).
Installation
2
cable lines.
2
Version: 1.3

Advertisement

Table of Contents
loading

Table of Contents