Operating instructions
Installation conditions:
The
checklist
•
( attachment: Transport and preliminary information).
•
The system is only suitable for outdoor installation.
Observe the following floor space requirements for the system:
•
− The floor space is to be constructed at the installation location in accordance with the local
conditions and technical data ( 3.2Technical data).
− The floor space is exactly horizontal.
− Cable entry is from below.
− The floor space has the required load capacity for the 1.25 t weight of the system and has to
withstand this load permanently.
If applicable, also take into account the weight of the means of transport.
− Sufficient drainage is available.
Earthing via ring earth electrode for flexible connection cable (min. 16 mm²) according to national
•
and local regulations and conditions must be in place.
Note that ventilation openings must be kept clear.
•
− The air at the ventilation openings must be able to circulate freely.
− During the entire operating time, no leaves, dirt, etc. must be sucked in from the ventilation
openings.
Protect the system against penetrating water (groundwater or flood hazard area).
•
Keep the existing housing doors closed.
•
Observe the required minimum distances of 1.5 m to adjacent structures. Make additional spacing
•
allowances for open doors and any escape routes.
When installing in built-up areas, observe the local noise abatement regulations (Germany: "Technische
Anleitung zum Schutz gegen Lärm" (Technical Instructions for Protection against Noise), abbreviated "TA
Lärm"). Observe the resulting minimum distances to residential buildings.
Power connections:
Note the information in the electrical diagram ( Electrical diagram in manual GSS0608).
4.9 Standards
Compliance with the protective aims of the applicable CE directives is confirmed by the EU conformity
declaration and is represented by a CE mark on the product. The EU conformity declaration is part of the
documentation.
Version:1.3
"Commissioning
Requirements"
GSS0608
must
be
completed
and
signed
Page 23 of 72