Installation

7 Installation

7.1 Checking delivery package

Check that the delivery package is complete and in flawless condition. If parts are missing or damaged:
Do not use the product! Submit a complaint to the supplier.
The delivery package consists of:
GSS0608 storage system (preassembled and prewired).
8 x battery module SRB5106 with installation material
Box with power cabling, communication cabling, key for SRC4310 and cabinet, screws, cable
clamps.
Manual GSS0608
CAUTION
Damage to property due to incorrect storage!
Store the battery modules properly until installation according to the
specifications in the battery module data sheet ( 2.5.3 Storage and supply of
new and used lithium batteries).

7.2 Installation requirements

NOTE
Observe requirements regarding installation location.
Observe the environmental conditions at the installation location as well as the
installation location requirements ( 4.8Requirements regarding installation
location).
Assembly must be performed only by qualified and trained personnel.
The storage system must not be put into operation in the case of transport
damage, non-observance of the environmental conditions and non-compliance
with the requirements regarding the installation location. If necessary, the
storage system must be taken out of operation in the case of changing
conditions.
NOTE
Observe weather conditions.
Make sure that the weather conditions are suitable for installing the system:
There is no wind or only a light wind up to wind force 2 (up to 12 km/h).
No rain is expected for the entire duration of all work operations. If rain is
expected, it may be necessary to set up a protective tent.
The ambient temperature during assembly is at least -20 °C and at most
+40 °C.
The interior rack system is delivered pre-assembled. The individual components are fully assembled and
connected. The exception is the installation and wiring of the battery modules.
Ensure that the two doors are freely accessible for installation, service and operation (recommended:
clearance of at least 1.5 m).
It must be possible to open both doors without obstructing or blocking an escape route or possible escape
doors in the installation area.