Assembly At Final Location - ADS-tec StoraXe PowerBooster GSS0608 Manual

Compact storage system
Table of Contents

Advertisement

NOTE
Note position of cable gland.
When preparing the floor space, pay attention to the recess for cable gland from
below.

7.3 Assembly at final location

The storage system is delivered preassembled. The individual components are pre-installed and already
connected. The exception to this are the installation and cabling of the battery modules.
CAUTION
Risk of injury!
There is a risk of crushing during installation of the storage system. Do not stand
underneath suspended loads.
Wear an appropriate protective equipment.
Assembly must be performed only by qualified personnel.
The cable gland is from below into the storage system. There are recesses here for screwing to
the floor. Use suitable dowels and screws for fastening.
Note the dimensions for screwing the system tight:
Fasten the system with screws and anchors that match the foundation.
Page 38 of 72
GSS0608
Installation
Version: 1.3

Advertisement

Table of Contents
loading

Table of Contents