Download Print this page

Figure 5-10: Ac Input Cable Connector Information; Table 5-2: Cables Needed For Power, Earth Ground, And Battery Connections; Table 5-3: Ac Input Cable Information; Cables Needed - Motorola SC 300 Manual

Bts hardware installation, atp and fru procedure
Hide thumbs Also See for SC 300:

Advertisement

Power, Ground and Battery Cabling for Sites Equipped With Optional
Primary Surge Suppressor

Cables Needed

Table 5-2: Cables Needed for Power, Earth Ground, and Battery Connections

Cable
Qty.
Part Number
A
1–4
3087701C02
S
1–4
3087854C02
T
1
Customer
Supplied
U
1–4
3087854C04
Y
1
Customer
Supplied

AC Input Cable Information

DEC 2000
SC 300 BTS Hardware Installation, ATP and FRU Procedures
– continued
Table 5-2 provides the quantity and description of the cables needed.
Ground cable, 8 -AWG, insulated copper wire. Requires one ring lug
connector.
AC input cable, 14 AWG, 5 m, is designed for 88–260 VAC power
input. Cable has Deutsch connector on both ends.
AC Input power cable. 10–14 AWG, 90 C wire. Designed for
120–240 VAC.
DC input cable, 14 and 22 AWG, 5 m, is designed for 20 to 30 VDC
power input.
Master Ground Cable, 6 -AWG, insulated copper wire.
The information for the AC input cable(s) (Cable S) is given in
Figure 5-10 and Table 5-3.

Figure 5-10: AC Input Cable Connector Information

B

Table 5-3: AC Input Cable Information

Connector
A
B
C
Description
A
SOCKET POSITION ON CABLE
CONNECTOR SHOWN
C
Wire Color
Description
Black
Green
White
PRELIMINARY
5
Line
Ground
Neutral
5-13

Advertisement

loading