Dimensions and Clearances
Figure 2-10: Concept of Functionality Clearances for MicroCell and PicoCell Units
2
2-18
– continued
THIS ILLUSTRATION SHOWS THE CONCEPT OF HOW
THE AREA ABOVE AND BELOW THE SC 340 BTS
SHOULD BE AT LEAST 25% UNOBSTRUCTED. THERE
IS NO BOX AROUND THE UNIT. BOX IS USED FOR
ILLUSTRATION PURPOSES ONLY
SC 300 BTS Hardware Installation, ATP and FRU Procedures
PRELIMINARY
DEC 2000