Unpacking the Equipment and Inspecting for Damage

Objective

How System is Packed

3

Inspecting for Damage

3-2
The objective of this procedure is to unpack the equipment and inspect it
for damage.
A unit is shipped in two boxes. Box 1 contains site installation specific
components and box 2 contains the unit itself. All of the following are
shipped in box 1.
Box 1
Solar or fin covers
Universal mounting bracket
Rack mounting adapters and hardware
Pole mounting adapters and hardware
Ceiling mounting adapter (Optional Kit T391AA)
External cables (AC input, DC input and SU)
Lower pin
Site I/O junction box and cable assembly
Terminations
AC Installation Box (required for outdoor applications)
Box 2
Microcell or Picocell unit
Box 3 (Optional)
Primary Surge Suppressor
Solar covers
Mounting bracket
Rack mounting adapters and hardware
Pole mounting adapters and hardware
Ground cables
The following are shipped separately:
Short duration battery (optional) (Kit T392AA)
Remote GPS receiver (optional)
Before installing any equipment, inspect it for damage. Report any
damage found to the Site Manager.
Only remove the equipment from the shipping containers when you are
ready to install.