Download Print this page

Figure 5-23: Punchdown Block Location; Figure 5-24: Punchdown Block - Motorola SC 300 Manual

Bts hardware installation, atp and fru procedure
Hide thumbs Also See for SC 300:

Advertisement

Site I/O, Span Line, RGPS and Modem Cabling for Sites Equipped With
Primary Surge Suppressor

Figure 5-23: Punchdown Block Location

5

Figure 5-24: Punchdown Block

5-26
– continued
SC 300 BTS Hardware Installation, ATP and FRU Procedures
PUNCHDOWN BLOCK
PRIMARY SURGE
SUPPRESSOR
PRELIMINARY
DEC 2000

Advertisement

loading