Download Print this page

Figure 5-12: Primary Surge Suppressor Ac Input Power Connection Locations - Motorola SC 300 Manual

Bts hardware installation, atp and fru procedure
Hide thumbs Also See for SC 300:

Advertisement

Power, Ground and Battery Cabling for Sites Equipped With Optional
Primary Surge Suppressor

Figure 5-12: Primary Surge Suppressor AC Input Power Connection Locations

AC LOAD
CENTER ALARM
CONNECTION
5
5-16
– continued
SC 300 BTS Hardware Installation, ATP and FRU Procedures
1–IN CONDUIT
NEUTRAL
GROUND
INPUT LINE 1
INPUT LINE 2
PRELIMINARY
CUSTOMER
AC POWER
COURCE
DEC 2000

Advertisement

loading