Installation Tools and Materials
1
Introduction
1-12
Many of the tools and materials depend on the style of the wall, pole,
rack or ceiling that the mounting bracket is being installed on. The tools
and materials required to install the BTS hardware are specified for each
mounting style. Due to the variability of mounting styles, additional
tools and materials may be required to meet specific site needs. This is
outside of the scope of this document and must be evaluated on a site to
site basis.
Also, for each procedure, a tools and materials list is provided within the
procedure.
Motorola kit T393AA is available for most installation styles and
methods. Motorola kit T393AA contains:
Torque driver wrench, 1/4–in. hex female drive, 0–10 N–m
T20 Torx Tamper Bit, 1/4–in. hex
T30 Torx Tamper Bit, 1/4–in. hex
Flathead bit
Torque ratchet wrench 3/8–in. drive, 0–10 N–M (Utica part number
TCI–150 R/A 3/8–in. or equivalent)
5/16 Breakaway 9–in. lb.
13/16 Breakaway 38–in. lb.
Wire Crimping Tool
Installation Handles, Motorola Part Numbers (Left Handle
0787668C01) and (Right Handle 0787668C02)
Screws M6x19 (Motorola Part Number 0387541C03)
Buckle Strap Tool
SC 300 BTS Hardware Installation, ATP and FRU Procedures