Fig. 29: Moving Out Cartridge Group 3; Fig. 30: Moving Out Cartridge Group 4 - ABB PT004165 Operation Manual

Table of Contents

Advertisement

Operation Manual / Power2 850-M / High-pressure stage
9 Disassembly and assembly / 9.7 Removing the cartridge group
CAUTION
Damage to cartridge group and toolbox cover
The turned-over toolbox cover may only be used for intermediate storage of
the cartridge group.
The cover must be on a level surface.
u
The cover may not be used to transport the cartridge group.
u
Fig. 29: Moving out cartridge group 3
9. Lower the cartridge group into the holders of the turned-over toolbox cover (90010) and
leave it secured to the crane.
Pay attention to note concerning aligning the cover.
10. Remove plate (90032), screw (90656), nut (90415) and plates (90031).
11. Remove the lamellar rings (64001).
Fig. 30: Moving out cartridge group 4
12. Remove O-rings (42017 / 42018).
© Copyright 2022 ABB. All rights reserved.
HZTL4063_EN
Rev.F
March 2022

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power2 850-m16

Table of Contents