Download Print this page

Pcbs - Daikin CTKC15QVM4 Removal Procedure

1.5/2.0/2.5/3.5/4.2/5.0 kw class, 9000/12000/15000/18000 btu/h class

Advertisement

PCBs

5. PCBs
Warning
Step
1. Remove the control PCB.
1
Remove the connector
[S26].
2
Release the harnesses
from the 3 hooks and
the slit.
3
Disconnect all the 5
terminals.
4
Release the earth/
ground wire (yellow/
green) from the slit and
the groove.
8
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Procedure
Hook
Slit
Black
White
Red
Slit
Groove
Earth/ground
wire
(yellow/green)
[S26]
Hook
(R22066)
Earth/ground (yellow/green)
Earth/ground
(green)
(R22067)
(R22069)
Si041551EB
Points
[S26]: display/signal receiver
PCB
Earth/ground (green)
1
2
3
FRONT
Black
Red
Earth/ground
White
(yellow/green)
Removal Procedure
(R22265)

Hide quick links:

Advertisement

loading