Download Print this page

Advertisement

Si121293EC

4. PCBs

Warning
Step
1. Remove the service
monitor PCB.
1
Unfasten the 4 hooks
and remove the
electrical box cover.
2
Disconnect the
connectors [S501],
[S502] and [S503] from
the service monitor
PCB.
3
Detach the 4
projections and remove
the service monitor
PCB.
2. Remove the terminal
board.
1
Remove the 4 screws
of the terminal board.
2
Remove the 2 screws
of the power supply
terminal board.
Removal Procedure
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Procedure
Hook
[S503]
[S501]
[S502]
Service
monitor PCB
Projection
Terminal board
Electrical box cover
Hook
Hook
Projection
(R22550)
Power supply
terminal board
(R18097)
Points
Hook
(R18095)
[S501] (red):
for [S209] on control PCB
[S502] (yellow):
for [S210] on control PCB
[S503] (white):
for [S206] on control PCB
black
brown
PCBs
blue
white
(R18107)
11

Hide quick links:

Advertisement

loading