Planning The Installation 规划安装; Addressing Items In The Planning Process 解决规划过程中的问题; Performing A Pre-Installation Check 执行安装前检查 - Wine Guardian D200 Installation, Operation And Maintenance Manual

Ducted wine cellar cooling systems
Table of Contents

Advertisement

Available languages

Available languages

Planning the Installation
Addressing Items in the Planning Process
Where to locate the unit? Should it be built into the wall or mounted remote and
ducted into the cellar?
How to mount the unit?
Decide where to locate the supply and return grilles in the room to achieve the
temperature gradient and circulation preferred.
Locate the electrical power outlet close to the unit, in cellar or out. Do not use
an extension cord!
Does the condenser heat exhaust need to be ducted away?
Where to locate the thermostat?
Where to run the drain line?
Are all the parts here to complete the installation?
在哪里安装主机?是将系统安装到墙上或主机安装窖外,由通风管道引入酒窖?
如何安装机组?
决定在何处安装供给和返回格栅,以达到温度梯度和理想的循环
将电源插座靠近机组, 窖内,窖外?不要使用延长线!
冷凝器热排气管道必须排出室外?
在哪里安装恒温器?
往哪里运行排水管线?
是否所有的部件在这里完成安装?
Performing a Pre-installation Check 执行安装前检查
✓ Check for the proper installation of the electrical plug configuration.
✓ Check for the properly sized breaker.
✓ Is the cellar built with adequate insulation and vapor barriers?
✓ Are ducts installed above the ceiling or in accessible places properly sized
before being covered?
✓ Is enough space available around the unit for service and repair?
检查了电源插座的配置是否正确安装。
检查合适尺寸的断路器。
是否有足够的绝缘和防潮层?
被覆盖之前,通风管道安装是否高于天花板顶部,或在出入方便的地方进入酒窖
设备周围是否有足够的空间可用来服务和维修设备?
37
规划安装
解决规划过程中的问题

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents