Section 5 Spare Part Replacing; Access To Command And Control; Replacing Main Pcb; Replacing Display Pcb - NUVE OT 020 Service Manual

Bench top steam sterilizers
Hide thumbs Also See for OT 020:
Table of Contents

Advertisement

Cautions : Disconnect the steam sterilizer before replacing any component !
5.1. Access to the Command and Control Unit (See Figure-7)
Remove the water filling line record (1) on the top of the steam sterilizer.
Take the cover sheet (2) out after removing the screws on the right and left sides of the steam
sterilizer.
5.2. Replacing Main PCB ( see Figure 8 & Figure 10)
Disconnect all cable terminals which are connected to main PCB clamps.
Disconnect the main PCB (7) - display PCB (31) connection cable from the main PCB.
Remove the 6 fixing screws of the main PCB and take the main PCB out.
Place the new main PCB and make all electrical connections according to the electrical circuit
diagram (see Figure 3 or Figure 4).
Connect the display PCB connection cables to the new main PCB.
5.3. Replacing Display PCB ( see Figure 8 & Figure 10)
Disconnect the main PCB (7)- display PCB (31) connection cable from the display PCB.
Remove the 8 connection screws of the display PCB and take the PCB out.
Place the new display PCB by meeting the display keys and their places on the panel sheet.
Check that the led lamps meet their places on the plastic panel.
Re-connect the main PCB - display PCB cable.

5.4. Replacing Temperature sensor

Disconnect the temperature sensor terminals from the main PCB (7).
Take the temperature sensor out by a wrench.
Connect a new temperature sensor.
Put some liquid gasket on the new temperature sensor's connection thread to ensure sealing and
fix the temperature sensor. (Be careful not to bend the connection cable)
Make the temperature sensor terminal connections according to the electrical circuit diagram
(Figure 3 or Figure 4).
5.5. Replacing Condense Solenoid Valve ( see Figure 9)
Remove the solenoid valve bobbin socket after removing its screw.
Remove the solenoid valve mounting screw from the bottom part of the mounting sheet.
Remove the solenoid valve (25) inlet and outlet hoses by loosening the connection nuts.
Take the connection adaptors on the solenoid valve inlet and outlet and fix them onto the new
solenoid valve.
Mount the new solenoid valve as its arrow direction is shown in the water and steam unit diagram
(Figure 5 or Figure 6)
Mount the solenoid valve bobbin socket.
SECTION 5
SPARE PART REPLACING
14

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ot 020v

Table of Contents