Flue Assembly And Rain Shield; Installation; Gas Furnace Condensate Drain - Trane IntelliPak with Symbio 800 Installation, Operation And Maintenance Manual

Commercial rooftop air conditioners
Hide thumbs Also See for IntelliPak with Symbio 800:
Table of Contents

Advertisement

Figure 29. Unit gas trains 500 MBh ultra modulating
UL 536 Flexible
Metallic Hose
1" field
connection elbow
RT-SVX063G-EN
Modulating valve
One stage valves
Manual shutoff
valve
Figure 30. Unit gas trains 850/1200 MBh 4 stage/
modulating/ultra modulating
One stage valve
UL 536 Flexible
Metallic Hose
One stage valve
1-1/4" (850 MBh) /
1-1/2" (1200 MBh) field
connection elbow

Flue Assembly and Rain Shield

Installation

1. Locate the flue vent chimney, vent elbow, and, if
required, the rain shield in the supply fan section of the
unit.
Notes:
1. Remove shipping covers prior to installation.
2. Refer to installation instructions in RT-
SVN030*-EN for more detailed instructions.
2. Install the flue vent elbow onto the inducer motor
housing using the provided sealing caulk and screws.
3. Install the flue vent chimney to the exterior of the flue
post.
4. Install the rain shield (40-75 ton units only) over the
combustion intake slots on the exterior of the vented
access panel.

Gas Furnace Condensate Drain

Units equipped with a gas furnace have a 3/4" CPVC drain
connection stubbed out through the vertical support in the
Installation
Modulating valve
(not on 4-stage)
One stage valve
UL 536 Flexible
Metallic Hose
One stage valve
Manual shutoff
valve
47

Advertisement

Table of Contents
loading

Table of Contents