Commissioning Instructions; Before Commissioning - Schwank novoSchwank D 20S U Technical Manual

Radiant tube heater
Table of Contents

Advertisement

novoSchwank shape U
11
Commissioning
instructions

Before commissioning

A qualified service engineer must carry out this
operation. The correct operation and fixing of the
heater is prerequisite for the warranty. Checking
gas lines and flue system is not included in this
service.

The heaters are only pre-set by the
manufacturer and must be adjusted for
proper operation according to gas
quality site on site.
For this information contact your local
gas company.
Check the function of the following equipment:
 Exhaust flue
 Combustion air supply
 Control kit
 Safety equipment
 Safety of electrical circuit
Pay attention when commissioning!
Vaporization of remaining grease of
metal kits may cause greasy mist. This
kind of mist disperses after approx.
30 minutes. During this time the room has
to be ventilated.
36

Advertisement

Table of Contents
loading

Table of Contents