Scope Of Delivery - Schwank novoSchwank D 20S U Technical Manual

Radiant tube heater
Table of Contents

Advertisement

3 Scope of Delivery

Reflector
Turnaround box
Fig. 1: Tube heater novoSchwank 45S U
Scope of delivery
The radiant tube heater novoSchwank consists of:
 Burner-kit with gas-burner, pre-mixing chamber,
burner control unit IC 4000/1,
gas combination valve [single-stage]
air differential pressure switch, electrical plug
connection and fan, burner kit complete
preassembled
 Radiant tubes with turnaround box, flange
packing,
Corrosion resistant and radiant-optimized
reflector, end cap and brackets for hanging
Tube bar
Suspension brackets
Reflector front plate
Flange packing
Tube
Accessories
 Central control unit SchwankControl Touch with
temperatures and operating schedules,
MODBUS control
 Central control SRT-1 with temperatures and
operating schedules
 Gas cock [gas connection] with thermal shut-off
device
 Gas hose connection
 Gas filter
 Supply air- / exhaust flue-system
 Adjustable steel wire suspension system [Gripple]
 Brackets for wall mounting of angled position
[15-30°] for novoSchwank U
 Flue gas diverter [type A]
 Ball protection grids [e.g. for sport halls]
 Reflector elongations
 Set for angled mounting
 Water protection cover box for burner kit
[stainless steel]
 Flue gas adapter
novoSchwank shape U
Burner kit
5

Advertisement

Table of Contents
loading

Table of Contents