Operating Description - Schwank novoSchwank D 20S U Technical Manual

Radiant tube heater
Table of Contents

Advertisement

novoSchwank shape U
8 Operating
description
Start-up
If heat demand exists, the fan will start up
automatically. A differential pressure arises in the
burner box, which is reported to the ignition kit via
the differential pressure switch.
After a pre-purge period of about 25 seconds the
automatic ignition starts [max. ignition time 5
sec.]. The twin solenoid valve with pressure
regulator opens the gas supply to the burner in 2
steps. The burner flame is controlled by an
ionisation electrode. The ignition is switched off, if
the ionisation electrode reports a flame to the
burner control unit IC 4000/1 within the safety
time.
If the ignition process fails, the burner control IC
4000/1 repeats the start-up for one more time.
Operation
A very long laminar flame is created in the first
tube by the special burner construction. The hot
flue heats the tube surface while being fed
through the tubes by the fan. The hot tubes emit
long-waved infrared radiation which is directed
to the room by the reflector construction.
The radiant tube heater novoSchwank works with
a closed combustion system. The combustion air
is taken from the room or from the outside. The
flue is evacuated indirectly into the room or
directly by the exhaust pipe or by a special
air/exhaust pipe system.
20
Fault
If no flame is reported during the pre-purge
period [including 1 repetition of ignition process],
the burner control unit IC 4000/1 will switch off the
radiant tube, error will give, fan runs in post-purge
time for 30 seconds and then heater will lock it.
Investigation and repair must be carried out by
authorized personnel only. After clearance of the
fault, the lock can be reset.
The cause of the fault / error code is displayed on
the central control unit SchwankControl Touch or
can read out via corresponding service software.
See chapter 12 for error codes.
Lock release can carry out by activate the reset
command via the central control unit
SchwankControl Touch or an interruption of the
electric power supply for 3 sec. A new start-up
begins. If no flame signal is reported to the burner
control unit IC 4000/1 during operation, the gas
valve shuts and stops the gas supply immediately.
A new start-up process is repeated.

Error codes and troubleshooting on
pages 44 -45
Monitoring of the combustion air supply
The combustion air supply is permanently
controlled by the differential pressure switch
during the operation.
If the differential pressure switch is not in rest
position during the start-up the operation will not
start. If the operating contact is not closed during
the pre-purge the system will set in interference
release.
If combustion air supply fails during operation
[lack of air], the differential pressure switch will
close the gas combination valve and stop the
gas supply.
A new start-up process is to be repeated.

Advertisement

Table of Contents
loading

Table of Contents