11  Commissioning Instructions; Before Commissioning - Schwank deltaSchwank Series Technical Manual

Radiant tube heater with pneumatic gas-/air ratio control
Table of Contents

Advertisement

deltaSchwank
11
Commissioning
instructions

Before commissioning

A qualified service engineer must carry out this
operation. The correct operation and fixing of
the heater is prerequisite for the warranty.
Checking gas lines and flue system is not
included in this service.

The heaters are only pre-set by the
manufacturer and must be adjusted
for proper operation according to gas
quality site on site.
For this information contact your local
gas company.
Check the function of the following equipment:
 Exhaust flue
 Combustion air supply
 Control unit
 Safety equipment
 Safety of electrical circuit
Pay attention when commissioning!
Vaporization of remaining grease of
metal units may cause greasy mist.
This kind of mist disperses after
approx. 30 minutes. During this time
the room has to be ventilated.
42