Operating Instructions; Power Up; Ettan Ipgphor 3 Control Panel - GE Ettan IPGphor 3 Instrument User Manual

Hide thumbs Also See for Ettan IPGphor 3:
Table of Contents

Advertisement

3

Operating instructions

Ettan IPGphor 3 Instrument User Manual 11-0034-58 Edition AB
The following sections will guide you through each stage of the isoelectric
focusing process using the Ettan IPGphor 3.
3.1

Power up

1
Turn on the mains power switch (|) located on the rear panel.
This activates a self diagnostic program that runs for approximately 10
seconds. A series of screens indicate progress. If any component fails, the
diagnostic program will stop and a message will indicate the source of the
fault; note the fault and press the START key to skip to the next test. If any
failure is detected, call GE Healthcare service.
WARNING! In a situation where there is a risk of injury, turn off the instrument
by switching the mains power switch (located on the rear panel) to position 0.
Malfunctions must be rectified before the Ettan IPGphor 3 is restarted.
3.1.1

Ettan IPGphor 3 control panel

Once the diagnostic program is successfully completed, the main screen
indicates that the instrument is ready, as shown below.
Ettan IPGphor 3
P r o t # 1 F i l e 1
R e h y d r a t e 0 : 0 0 H r @ 2 0 ˚ C
I E F @ 2 0 ˚ C 5 0 µ A / S t r i p
1 S t r i p s 0 S t e p s
Fig 3-1. Ettan IPGphor 3 control panel.
Operating instructions
/
L
Mains power
switch
3
21

Advertisement

Table of Contents
loading

Table of Contents