Control Levers-Road Builder - Hitachi Zaxis 200LC Operator's Manual

Forester
Hide thumbs Also See for Zaxis 200LC:
Table of Contents

Advertisement

Control Levers—Road Builder
CAUTION: Never place any part of body beyond
window frame. It could be crushed by the boom
if boom control lever is accidently bumped or
otherwise engaged. If window is missing or
broken, replace immediately.
Prevent possible injury from unexpected
machine movement. Make sure you know the
location and function of each control before
operating.
With this control pattern, functions must
correspond to the black-on-white labels located
on the control console.
IMPORTANT: Prevent possible machine damage.
When digging, avoid contacting tracks
with boom cylinders or bucket.
When digging over the end of the
tracks, travel motors should be at the
rear to minimize chain and sprocket
wear and to maximize machine stability
and lift capacity.
1. Operate control levers to verify that control pattern
labels match machine operation.
2. Position travel motors to rear of machine before
digging.
Operation—Operating The Machine
Continued on next page
2-2-7
OUT1739,00001F1 –19–16JUN06–1/2
081407
PN=60

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zaxis 250Zaxis 350

Table of Contents