Check Track Sag - Hitachi Zaxis 200LC Operator's Manual

Forester
Hide thumbs Also See for Zaxis 200LC:
Table of Contents

Advertisement

Check Track Sag

1. Swing upperstructure 90° to tracks and position boom,
arm and front attachment as shown.
2. Raise track off ground with boom.
CAUTION: Prevent possible injury from
unexpected machine movement. Place blocks
under machine frame to support machine while
measuring track sag.
3. Place blocks under machine frame to support machine.
4. Rotate track forward two full rotations and then in
reverse two full rotations.
Maintenance—As Required
Continued on next page
3-3-4
Road Builder Position
Live Heel Grapple Position
Articulated Grapple Position
TX14740,0001F8F –19–06DEC02–1/2
081407
PN=112

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zaxis 250Zaxis 350

Table of Contents