Switches; Additional Information On I/O Connections; Pnp Configuration For Digital Inputs (X2 & X3) - ABB ACS580-04 Hardware Manual

Drive modules
Hide thumbs Also See for ACS580-04:
Table of Contents

Advertisement

6)
Connected with jumpers at the factory.
7)
Use shielded twisted-pair cables for digital signals.
8)
Ground the outer shield of the cables 360° at the cabinet entry.
9)
WARNING! Connect an external AC power supply (24 V AC) only to control unit connectors
40 and 41. If you connect it to connector AGND, DGND or SGND, damage to the power supply
or control unit can occur.

Switches

Switch
Description
TERM
EFB link termination. Must be set
S4
to the terminated (ON) position
when the drive (or another
device) is the first or last unit on
the link.
BIAS
Switches on the biasing voltages
S5
to the bus. One (and only one)
device, preferably at the end of
the bus must have the bias on.

Additional information on I/O connections

PNP configuration for digital inputs (X2 & X3)
Internal and external +24 V power supply connections for PNP configuration are shown
in the figure below.
Internal +24 V power supply
PNP connection (source)
X2 & X3
WARNING!
Do not connect the +24 V AC cable to the control unit ground when the control
unit is powered from an external 24 V AC supply.
10
+24V
11
DGND
12
DCOM
13
DI1
14
DI2
15
DI3
16
DI4
17
DI5
18
DI6
Position
Bus not terminated (default)
ON
TERM
Bus terminated
ON
TERM
Bias off (default)
ON
BIAS
Bias on
ON
BIAS
External +24 V power supply
PNP connection (source)
0 V DC
+24 V DC
Control unit 139
X2 & X3
10
+24V
11
DGND
12
DCOM
13
DI1
14
DI2
15
DI3
16
DI4
17
DI5
18
DI6