5. Installation of Chamber
5.4 INSTALLATION OF CHAMBER - SECTION D2
Backfill around chamber with concrete
To be followed when installing chamber in the ground.
17
Completely fill chamber with water.
19
Allow concrete to cure.
18
Fill void between soil and chamber with
concrete (min. C35 grade) or as per
engineer's drawings.
01992 523 523 | info@deltamembranes.com | www.deltamembranes.com
13