5. Installation of Chamber
5.0 INSTALLATION OF CHAMBER - SECTION A
Construction of reinforced concrete box
1
Excavate hole for chamber. Refer to section
10.0 for RC box internal dimensions.
3
Lay inlet and discharge pipework. Allow
pipework to protrude into RC box by a
minimum of 100mm.
8
FOUL V3 INSTALLATION GUIDE
2
Install re-bar as per structural engineer's
drawings.
4
Pour concrete to form RC box as per
structural engineer's drawings.