Set-Up Instructions
1
Instrucciones para la instalación
Instructions de montage
The 5COM-SP-MU-50 commercial aroma pump is a micro-dosing pump specifically designed to pump pure aroma oils. Pure oil is required for proper
function of the 5COM-SP-MU-50 commercial aroma pump. The 5COM-SP-MU-50 pump is for use only with 5COM(09-48)-PAC series steam genera-
tors which are equipped with the digital commercial control package. For questions about compatibility always check with Delta Faucet Company
directly.
5COM-SP-MU-50 pump oils are not for oral consumption and should not be applied to the skin. Keep the
aroma oils and the 5COM-SP-MU-50 pump out of the reach of children. Aroma oils are not a cure or treat-
ment for any medical conditions. Elderly persons, pregnant women, or those suffering from heart disease,
high blood pressure, diabetes, or who are otherwise not in good health, do not use this devise unless
directed to do so by a physician. Also do not use the steam bath while under the influence of alcohol.

Installation Instructions

1. Select a location for mounting the 5COM-SP-MU-50 pump system in a utility area or closet near the steam generator. The oil is injected directly
into the steam line with an Aroma Injection Tee (2) going to the steam head (see Figure 2). The distance from the pump to the Aroma Injection Tee
should not exceed six feet. The Aroma Injection Tee and the clear tubing (3) that carries the oil to the Aroma Injection Tee (2) must not be installed
inside walls (see Figure 2). The tubing and Aroma Injection Tee must be completely accessible for proper setup. Do not install any part of this
assembly inside a finished wall without an access panel. The location may be above or below the steam line connection. The location should be
convenient for replacing the oil canisters.
2. The 120 volt plug from the 5COM-SP-MU-50 pump must be plugged into the appropriate receptacle on the steam generator. The receptacle is
only provided on the 5COM(09-48)-PAC. The 120 volt receptacle on the generator controls the pump by providing voltage at the appropriate time.
Note 1: The generator is equipped with 2 receptacles for the possibility of controlling 2 steam rooms and the appropriate pump must be connected to
the appropriate receptacle. If the generator is set up to supply steam to two rooms, a second 5COM-SP-MU-50 pump and oil canister will be needed.
Note 2: The receptacles must be connected to a separate 120 volt 15 amp circuit. This connection is part of the generator installation. For further infor-
mation please consult the generator instructions.
3. Secure two screws in the wall to hang the 5COM-SP-MU-50 pump system in this location. The screws should be placed 9" apart and in a vertical
orientation (see Figure 6).
4. Choose a location for the Aroma Injection Tee (2) (See Figure 2). The location must be level with or above the steam head. DO NOT install the
Aroma Injection Tee below the steam head. Not doing so will ensure a better aroma flow to the steam room and prevent backflow of oil to the
generator. When the steam generator outlet is located below the steam head make a minimum of a 1" riser in the steam line located between the
steam generator and the Aroma Injection Tee.This will prevent the aroma oil from backing up into the generator. The location of the Aroma Injec-
tion Tee must remain accessible after the installation is complete. Do not install the Aroma Injection Tee behind a finished wall without an access
panel.
5. Make sure the plastic fittings are removed before sweating (soldering) the Aroma Injection Tee in place. Sweat (solder) the Aroma Injection Tee
into the steam line in the horizontal position (as shown in Figure 2). Do not install in any other position.
Note: The Steam Generator should be mounted in a location convenient for hook-up and service by the plumber and electrician.
Aroma pump assembly and setup
1. Install the black peristaltic tube into the pumps (see Figure 3).
a. Remove (unsnap) the plastic cover exposing the pump roller assembly.
b. Pull out the Rollor about a 1/4".
c. Place the tube between the pump base and each of the rollers forming a loop where the tube follows the inside upper curve of the pump
base.
d. Push the lower right and lower left ends of the black tubing into the blue pump base securing it in the provided grooves.
e. Replace the cover on to the pump base. Verify that the pump cover is properly attached to the pump base so that there is no space
and the pump cover is not crushing the tube.
2. Clear tubing connections: The clear tubing that is used to carry the oil to the steam line is secured with special 1/8" tubing fittings. These fittings
are assembled by sliding the tube through the nut and bottoming the tube into the fitting. Then tighten the nut until the tube is secured.
a. With the canister removed the clear suction tubes should extend from the left side of the pump to the bottom of the canister. This will
ensure that when the bottle is in the holder that the tube will extend to the bottom of the canister. Connect the clear tube to the black
peristaltic tube on the left (inlet) side of the pump.
b. Connect the outlet side of the pump (right side) to a length of clear tube that will be long enough to reach the Aroma Injection Tee
connected to the steam line.
c. Route the tube to the Aroma Injection Tee (2) (see Figure 2).
d. Connect the tube to the fitting (1) on the Aroma Injection Tee adapter (2) (See Figure 2).
Figure 2
WARNING
!
3
1
2