Installation Of Chamber - Section G - Delta FOUL V3 Installation Manual

Table of Contents

Advertisement

5. Installation of Chamber

5.8 INSTALLATION OF CHAMBER - SECTION G

Installing pump in chamber and AlertMaxx2 EC or Delta HLA
27
Fill chamber half full with water.
29
Tighten the two screws on the DC65 to seal
the pipework.
28
Slide the DC65 over the discharge arm and
lower the pump in to chamber to release
any trapped air. Slide the DC65 up to join the
manifold to the discharge arm.
30
When installing a high level alarm, refer to
the AlertMaxx2 EC installation instructions.
01992 523 523 | info@deltamembranes.com | www.deltamembranes.com
17

Advertisement

Table of Contents
loading

Table of Contents