Installation Of Chamber - Section C - Delta FOUL V3 Installation Manual

Table of Contents

Advertisement

5. Installation of Chamber

5.2 INSTALLATION OF CHAMBER - SECTION C

Connecting discharge, cable duct and vent
9
Wrap the thread on a high pressure male
iron with PTFE tape.
11
Apply solvent cement around the first 20mm
of the external face of the discharge, cable
duct and vent pipe and internal side of their
respective male iron.
10
FOUL V3 INSTALLATION GUIDE
CHANNEL TO CHAMBER
10
Screw the high pressure male iron into the
socket.
12
Push discharge, cable duct and vent pipe
into their respective male iron, twisting the
pipe as it is pushed into the male iron to
remove any trapped air.

Advertisement

Table of Contents
loading

Table of Contents