Installation Guidelines; Pump Station Locations; Rc Box Dimensions - Delta FOUL V3 Installation Manual

Table of Contents

Advertisement

4. Installation Guidelines

4.0 INSTALLATION GUIDELINES
The following instructions are for guidance only and it is the contractors responsibility to ensure
that the installation is in accordance with the prevailing ground conditions and good building
practice, to eliminate any potential damage to the pump station either during or after installation.
Please read these instructions carefully prior to installing the chamber. If there is anything that is
unclear, please contact our technical help desk on 01992 523 523
4.1 PUMP STATION LOCATION
This station requires routine maintenance, therefore it is important that careful consideration is
taken to position the chamber in a location that allows permanent access to the chamber.

4.2 RC BOX DIMENSIONS

01992 523 523 | info@deltamembranes.com | www.deltamembranes.com
7

Advertisement

Table of Contents
loading

Table of Contents