11.0
Installation of Chamber - Section D2
Backfill around chamber with concrete
To be followed when installing chamber in the ground.
25
Completely fill chamber with water.
27
Allow concrete to cure.
For technical support, please call 01279 757400
26
Fill void between soil and chamber with concrete
(min. C35 grade) or as per engineer's drawings.
Delta Dual V4/V6
17