Sokkia CX-52 Operator's Manual page 199

Compact x-ellence station
Table of Contents

Advertisement

4. Collimate the first target point and
press [MEAS].
After confirming the measured
result, press [OK].
5. Measure the second target point
in the same manner as the first
one.
Confirm the measured result and
press [OK].
6. Confirm the measured result of
the baseline defined from the line
between the first target point and
the second one.
Pressing [OK] sets the
instrument's point coordinates and
angle.
Continue with the measurement of
Point to Line.
• Pressing [S.CO] displays the
instrument point coordinates
defined from the measurement
results of the first target point
and the second one.
Pressing [OK] conducts
measurement of Point to Line.
26. Point to Line MEASUREMENT
Measure 1st PT
ZA
0
0 0
HA-R
0
0 0
HR
1003
PT
SD
5.123m
ZA
3 4
5 6
HA-R
1 2 3
4 5
HR
1003
PT
REC
Measure 2nd PT
ZA
4 5
1 2
HA-R
1 7 8
5 6
HR
1004
PT
MEAS
SD
5.123m
ZA
4 5
1 2
HA-R
1 7 8
5 6
HR
PT
1004
REC
MEAS
Baseline pt1-pt2
0.123m
HD
VD
-0.003m
0.156m
SD
S.CO
N0:
E0:
Z0:
HI
REC
0 0
0 0
1.000m
MEAS
1 2
2 6
1.000m
MEAS
OK
3 4
3 1
2.000m
3 4
3 1
2.000m
OK
OK
20.000
30.000
40.000
2.000m
OK
191

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cx-55

Table of Contents