Index MS32-6.2 Operating Instructions Manual page 69

Table of Contents

Advertisement

Maintenance Summary - 2.000 Operating hours
Maintenance Instructions
MS32-6.2
DIM012EN - 03.06.2020
2.
Example: Gas pressure damper (ACE)
Check gas springs. In the second step, the condition of the gas springs should
be inspected after opening the door. If one of the gas springs is highly wet, it
must be replaced. In case of heavy soiling (depending on the environment), dirt
adhering to the gas spring may embed into in the seals, thereby damaging the
piston rod and seals. Over time this leads to malfunction of the gas springs.
3.
Example: Cabinet doors on a multi-spindle lathe
Checking the door after opening. Another test is that after opening the door and
reaching the end position, the door should be horizontal and parallel to the
machine. If the door bends on one side or even leaves its Open position, both
gas springs or only the defective gas spring needs to be replaced.
4. Replace gas spring. If a gas spring needs to be replaced, be sure to read the
manufacturer documentation. When installing the new gas spring, make sure
that the installation position (flush) is oriented in the direction of movement of
the control cabinet door. Improper installation may cause immediate
destruction of the new gas spring. such as bending or kinking.
65

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ms16-6Ms16-6plusMs40-8Ms40-6Ms52-6.3Ms22-8

Table of Contents