Allied Telesis x530L Series Installation Manual page 190

Stackable gigabit layer 3+ ethernet switches
Hide thumbs Also See for x530L Series:
Table of Contents

Advertisement

Chapter 8: Building the Stack Trunk with 5Gbps Multi-Speed Ports
Table 29. Configuring the x530L-10GHXm Member Switches - Part II (Continued)
Step
8
Designate the ports as the stack trunk with the STACKPORT command.
awplus(config-if)# stackport
% Save the config and restart the system for this change to take
effect.
The remaining steps save your changes and reboot the switch.
9
Return to the Global Configuration mode.
awplus(config-if)# exit
10
Return to the Privileged Exec mode.
awplus(config)# exit
11
Save your changes with the WRITE command.
awplus# write
Building configuration ...
[OK]
12
Restart the switch.
awplus# reboot
reboot system? (y/n):
13
Type "Y" for yes.
14
Wait two minutes for the switch to initialize its management software.
15
Go to "Verifying x530L-10GHXm Member Switches," next.
Verifying x530L-
10GHXm
Member Switches
Step
1
Start a local management session. Refer to "Starting a Local Management Session" on
page 150.
2
Move to the Privileged Exec mode.
awplus> enable
190
Description and Command
Perform the steps in Table 30 to confirm the configuration of a member
switch.
Table 30. Verifying the x530L-10GHXm Member Switches
Description and Command

Advertisement

Table of Contents
loading

Table of Contents