Allied Telesis x530L Series Installation Manual page 130

Stackable gigabit layer 3+ ethernet switches
Hide thumbs Also See for x530L Series:
Table of Contents

Advertisement

Chapter 6: Installing the Switch on a Wall
130
Figure 71. Marking the Screw Holes
6. Place the switch on a table or desk.
7. Use the stud finder to check for hot electrical wires at the locations of
the screw holes.
Warning
Do not install the switch on a wall near hot electrical wires.
8. If the wall material requires pre-drilling the screw holes, use a drill to
drill the holes. The dimensions of the supplied screws and anchors are
in "Unpacking the x530L-10GHXm Switch" on page 96 and
"Unpacking the x530L-18GHXm Switch" on page 99.
9. If the wall material requires anchors, insert the anchors into the screw
holes.
10. Have another person hold the switch at the selected wall location while
you secure it to the wall with appropriate screws.
11. After installing all the switches of the stack, do one of the following:
To build the stack with the default stacking ports, go to Chapter 7,
"Building the Trunk with the Default 10Gbps Stacking Ports" on
page 141.
To build a stack of x530L-10GHXm switches using 5Gbps ports for
the trunk, refer to Chapter 8, "Building the Stack Trunk with 5Gbps
Multi-Speed Ports" on page 161.

Advertisement

Table of Contents
loading

Table of Contents